Skip to content

Illuminated Garden’s 2020

  • by

Limegreen has again provided power infrastructure to Illuminated Garden Events this winter.

Over a period of 3 weeks, a team of 6 have installed over 26,000m of power cable, distribution boxes, time switches, festoon lighting and cable ramp. As well as carrying out BS7909 testing for each of the sites.

It has been fantastic to see the pictures and read the positive comments on social media!